• Hnarl Dingli ECU Electronic Control Unit Dl-00000692
  • Hnarl Dingli ECU Electronic Control Unit Dl-00000692
  • Hnarl Dingli ECU Electronic Control Unit Dl-00000692
  • Hnarl Dingli ECU Electronic Control Unit Dl-00000692
  • Hnarl Dingli ECU Electronic Control Unit Dl-00000692
  • Hnarl Dingli ECU Electronic Control Unit Dl-00000692

Hnarl Dingli ECU Electronic Control Unit Dl-00000692

After-sales Service: Yes
Warranty: 1 Year
Type: ECU
Application: Dingli Scissor Lift
Certification: CE
Condition: New
Customization:
Gold Member Since 2023

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company

Basic Info.

Model NO.
DL-00000692
Part Type
Dingli Electric Driving Electronic Control Unit
Compatible Equipment Type
Dingli Scissor Lift
Compatible Equipment Make
Dingli
Part Number
Dl-00000692
Application1
Used for Dingli Electric Driving Scissor Lift
Application2
Jcpt0708dcs, Jcpt1614DC / Jcpt1612dcb, Jcpt1612dcs
Application3
Jcpt1212DC/Jcpt1012DC, Jcpt1008DC,Jcpt0808DC, Jcpt
Quality Level
High Performance
Stock
Enough
Weight
0.600 Kg
Transport Package
Standard Export Packing
Specification
25X25X5 cm
Trademark
HNARL
Origin
China
Production Capacity
500pieces/Week

Product Description

Hnarl Dingli ECU Electronic Control Unit Dl-00000692
HNARL DINGLI ECU Electronic Control Unit DL-00000692
DINGLI electric driving Electronic Control Unit
Parts No:
DL - 00000692
Used for Dingli electric driving scissor lift
JCPT0708DCS, JCPT1614DC / JCPT1612DCB, JCPT1612DCS , JCPT1412DC, JCPT1212DC/JCPT1012DC, JCPT1008DC,JCPT0808DC, JCPT0807DC
Packing Specifications:
Length (mm)
130
Width (mm)
120
Height (mm)
50
Weight (kg)
0.5

Dingli electric driving scissor standard configuration Proportional controls Automatic pothole protection Self-lock gate on platform Drivable at full height Non marking tyre 2WD Automatic brakes system Emergency stop button Emergency lowering system Cylinder holding valve Onboard diagnostic system Tilt sensor with alarm All Motion Alarm Horn Hour meter Safety brackets Forklift pockets Folding guardrails Extended platform Charger protection Flashing beacon



Option configuration Overload sensor with alarm AC power on the platform Platform work lights Airline to the platform









 
Hnarl Dingli ECU Electronic Control Unit Dl-00000692
Hnarl Dingli ECU Electronic Control Unit Dl-00000692
Hnarl Dingli ECU Electronic Control Unit Dl-00000692


Hnarl Dingli ECU Electronic Control Unit Dl-00000692Hnarl Dingli ECU Electronic Control Unit Dl-00000692Hnarl Dingli ECU Electronic Control Unit Dl-00000692Hnarl Dingli ECU Electronic Control Unit Dl-00000692
Product Delivery
Shipping Time
Start & End
Descriptions
By Express.
DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect
3-8 working days
Door to Door
For Small order, Sample order, Trial order
Fast & Convenient
Air Transportation
By Plane
5-10 working days
Door to Airport
For Medium order
Fast & Cheaper than express
The consignee needs to take delivery at the airport
Sea Transportation
By Vessel
20-45 days
Door to Seaport
For Mass order
Cheap but take time
The consignee needs to take delivery at the seaport
Hnarl Dingli ECU Electronic Control Unit Dl-00000692
FAQ
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.

Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.

Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
 
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now